New build and rehabilitation, dry installation
Tectum Pro
Dry-laid, micro-ventilated roof. Clima Pro panels interlock and the batten already sets the tile spacing.
Build-up
- Waterproof/breathable film, laid on the roof deck
- Clima Pro panel (EPS and Neopor, tongue-and-groove)
- Batten for Clima Pro insulation (T-320, T-380 or T-397)
- Clay or concrete tiles